Civil engineering

City of Saint-Zotique

Cost of work

$2M

Completion period

2024

01 / description

The reconstruction work on 23rd Avenue in Saint-Zotique included, but was not limited to:

  • Replacement of the storm sewer system serving the basin downstream from École secondaire des Navigateurs, including resizing of the pipes;
  • Culling of ditches;
  • Replacement and/or reconstruction of the water and sanitary sewer systems;
  • Reconstruction of the storm outfall;
  • Road reconstruction where required;
  • Site remediation work.
02 / particularities

Following the approval of an 80 L/s stormwater discharge from the new Navigateurs High School, issues arose with the existing storm sewer system. A design report was prepared to evaluate the various options and their costs. Furthermore, the shallow depth of the 23rd Avenue storm sewer system limited the available solutions.

03 / complexities

The project presented the following challenges:

  • Possible minimally invasive solutions;
  • Very limited rainwater cover;
  • Managing a pumped flow from the school.
Crédit : Ville St-Zotique
04 / services provided
  • Field surveys
  • Geotechnical, environmental, wildlife, and flora studies
  • Preparation of plans and specifications
  • Preparation of tender documents
  • Cost estimation
  • Project coordination, including obtaining agreements and authorizations from the MTMD, MELCCFP, and DFO
  • Bid analysis
  • Preparation of the site quality control mandate
  • Office and site supervision
05 / constraints
  • Work carried out near an occupied secondary school.